
Case Study:
Gonzaga College High School
Washington D.C.
Failure:
Due to unqualified contractor and trusting private school. Contractor underbid job and walked away leaving an ususable surface with two weeks to the start of the season.
Evergreen Solution:
Field had to be removed within six weeks of installation. Sub-base and turf had to be completely taken out and redone from scratch.